FCN Substation

This firm fixed price contract was performed for the US Air Force located in Family Housing on McGuire Air Force Base, New Jersey. 

This project required ECE to construct a new 35KV Electrical Substation.  This project was intended to permanently isolate the electrical distribution at Falcon Courts North Housing area from the existing substation inside McGuire AFB. 

Construction included installation of a 35KV shelter with vacuum circuit breakers that feed the double ended 7500/9375 KVA/OA/FA transformers to a secondary shelter, installation of 3000 LF concrete encased duct banks, electrical manholes, electrical vault, pulling and termination of conductors.  Coordination with Base electrical shops, and Jersey Central Power & Light was required prior to final connection to their transmission power lines.